Home/Products/ATLAS
NORA EA COMPLIANCE
Ten stages, one guided path to accreditation
ATLAS takes government entities through the DGA’s ten-stage NORA programme. It guides each stage, holds the evidence, checks it with AI, scores maturity and produces the reports accreditation asks for.
01 / THE PROBLEM
Every NORA cycle starts again from scratch
Accreditation means ten stages of deliverables, evidence and approvals. Most entities rebuild them by hand with consultants at every cycle, and the knowledge leaves when the consultants do.
stages in the DGA’s NORA programme, each closing on its own exit deliverables.
NORA Guideline, DGA, 2024reference models to build and approve: performance, business, application, data and technology.
NORA Guideline, DGA, 2024areas of continuous governance running across every stage.
NORA Guideline, DGA, 2024years covered by the target architecture blueprint in Stage 7.
NORA Guideline, DGA, 202402 / THE PROGRAMME
Ten official stages, one thread of governance
The DGA’s NORA Guideline sets ten stages, run in sequence, each closing on its own exit deliverables. Continuous governance runs across all of them.
EA Project Strategy
An approved EA project strategy: value, goals, scope, schedule, cost and staffing.
03 / HOW IT WORKS
From first upload to submission
Set up. Your entity, its stages and its people in one place.
ATLAS
Creates your organisation profile and the ten-stage journey, with roles for the EA lead, architects and contributors.
YOU
You invite your team.
04 / EVIDENCE CHECK
Evidence in, a score you can explain out
Each piece of evidence passes six checks before it is scored. Off-topic evidence is turned away early, and every score comes with the criteria and excerpts behind it.
05 / MATURITY
Know where you stand before you submit
ATLAS rolls every control up into a stage score and an overall maturity level. ATLAS’s view: Level 3 and above is a strong basis for submission. Move the slider to see the levels.
06 / ASSISTANT
Ask about the method, in Arabic or English
The assistant answers from the NORA method and from your own documents, and shows the page and section behind every answer.
07 / WHAT CHANGES
What ATLAS changes
Drag the line to compare how it works today with how it works with ATLAS.
08 / BUILT FOR THE KINGDOM
Built around the DGA’s NORA programme.
The ten official stages, their deliverables and their gates, in Arabic and English, with your knowledge kept inside your entity rather than leaving with consultants.
09 / NEXT STEP